Air Conditioning Clean Room Modular Air Handling Unit
Contact Supplier
Product Attributes
- Customization
- Available
- Type
- Air Handling Unit
- Air Tube Material
- Galvanized Sheet
- Model NO.
- EST12HC6
- Corrosion Durability
- Higher
- Operating Voltage
- 380/400 VAC
- Noise Level
- Low
- Application Fields
- Air-Conditioning (HVAC)System
- Mounting
- Floor Standing
- Lifetime
- >20 years
- Certification
- ISO, CE
- Condition
- New
- Cooling/ Heating Coil 1
- Copper Tube with Aluminium Fins (Cu/Al), Gi/SUS Fr
- Base
- C-Channel Hot DIP Base
- Ahu Construction
- 25mm/ 50mm/ 75mm Double Skin
- Optional 1
- VSD, VFD
- Optional 2
- Heat Recovery Wheel
- Control
- Option for PLC, Ddc
- Cooling/ Heating Coil 2
- Copper Tube with Copper Fins (Cu/Cu), Gi/SUS Frame
- Ahu Panels
- Painted Steel, Gi, Ss Panels
- Filters
- Pre-Filter, Bag Filter, HEPA Filter
- PU Foam Insulation
- 43-48kg/M3
- Ahu Framework
- Aluminum
- Fan
- Belt Drive Centrifugal Fan, Plug Fan,Ec Fan
- Cold Bridge Free Design
- Yes
- Side Sliding Filter with Tracks
- Yes
- Optional 3
- Ep, Chemical Filter, Plasma Sterilizer, Ak
- Transport Package
- Standard Package
- Specification
- CE
- Trademark
- ESACIR
- Origin
- Guangdong, China
- HS Code
- 8415830000
- Production Capacity
- 2000pieces/Year
Product Images of Air Conditioning Clean Room Modular Air Handling Unit
Find Similar Products
Product Description
a) Structure:
1)Adopt Aloy frame, which is anodic oxidation treated to ensure good anti corrosion performance and nice outlook
2)Adopt no cold bridge design, frame mounted inside and jointed with high strength nylon tee
3)Smooth inner surface stop dirty to stay which can be applied in clean system
4)Adopt modular design, each module size is 100mm. The unit size is calculated on 100mm base
b) Panel
1)Adopt sandwich design panel , adopting aluminum profile with good insulation performance
2)Adopt polyurethane foaming , foaming condensity is 48kg/m3 prevent heat to transfer.
3)Adopt double skin colorful steel panel, SUS panel and Salinization steel are for option
4)Panel thickness :25mm is for standard. 50mm is optional.
c) Perfect tightness
1)Adopt rubber double seal for frame and panel to guarantee good elasticity and anti-aging performance
2)Adopt hollow rubber with positive -negative pressure follow-up; it will be compressed tightly no matter with positive or negative pressure
3)Adopt Special aluminum alloy system linking piece to fix on the frame by screws ensure reliable performance
4)Casing air leakage is less than 1% under 1000Pa under standard working condition
d) High heat transfer efficiency heat exchanger
1)Adopt seamless copper tube and aluminum fin heat exchanger
2)Adopt 4 rows, 6rows, 8rows coil. Standard Aluminum fin space is 2.5mm, non standard fin space is for option
3)Coil rows, fin space, circuit No. can be calculated by selection program for different working condition.
4)Unique coil distributing design ensures water drainage thoroughgoing and reduce possibility of coil frost crack
e) Drain pan
Dry type condensate drain pan with drainage slop is adopted to ensure good drainage performance and the drain pan is insulated to prevent condensation.
2.Eurostars Air handler,air handling unit, ahu application
The AHU is used to control the following parameters of the space.
Temperature
Humidity
Air Movement
Air Cleanliness
3.Air handler technical data, Assembly drawing diagram and photo
| Horizontal Air Handling Unit(Return Air Condition-6 Rows) | ||||||||
| Model | Air Flow | Total Pressure |
Power Input | Return Air | ||||
| Cooling Capacity | Heating Capacity | Water Flow | Water Resistance | Water inlet/outlet pipe Diameter | ||||
| *1000CMH | Pa | kW | kW | L/min | kPa | DN | ||
| EST10HC6 | 10 | 350 | 2.2 | 78.7 | 101.8 | 225.6 | 33.3 | 50 |
| EST12HC6 | 12 | 400 | 3 | 94.4 | 122.1 | 270.6 | 30.4 | 65 |
| EST15HC6 | 15 | 400 | 4 | 119.3 | 154.4 | 342 | 38.2 | 65 |
| EST18HC6 | 18 | 400 | 5.5 | 143.1 | 185 | 410.4 | 40.2 | 65 |
| EST20HC6 | 20 | 400 | 5.5 | 167.8 | 217.1 | 534 | 43.1 | 80 |
| EST23HC6 | 23 | 400 | 5.5 | 192.3 | 241.9 | 552 | 33.3 | 80 |
| EST25HC6 | 25 | 400 | 7.5 | 203.6 | 263.4 | 583.8 | 45.1 | 80 |
| EST28HC6 | 28 | 500 | 2*4 | 220.6 | 285.5 | 636 | 17.6 | 80 |
| EST30HC6 | 30 | 500 | 2*5.5 | 239.7 | 310.5 | 688.2 | 29.4 | 2*65 |
| EST35HC6 | 35 | 500 | 2*5.5 | 283.4 | 366.8 | 813 | 31.4 | 2*65 |
| EST40HC6 | 40 | 500 | 2*5.5 | 325.7 | 421.4 | 934.8 | 34.3 | 2*65 |
| EST45HC6 | 45 | 500 | 2*7.5 | 372.2 | 481.7 | 1068 | 31.4 | 2*65 |
| EST50HC6 | 50 | 600 | 2*11 | 419.9 | 543.4 | 1240.2 | 41.2 | 2*80 |
| NOTE: | ||||||||
| 1. Return air: Cooling: Air in 27ºC DB, 19.5ºC WB,Chilled water in/out:7ºC /12ºC; | ||||||||
| 2. Return air: Heaing: Air in 15ºC DB,Hot water in: 60ºC. | ||||||||

4.Eurostars air handling unit , air handler range or series
-Horizontal ceiling ducted air handling unit
-Horizontal concealed air handling unit
-Vertical concealed air handling unit
-Vertical exposed air handling unit
-Modular Modulus Air Handling Unit-multi-function air handling unit

5.Components-air handling unit or air handler
Housing
--The housing that contains all the other components of an AHU is usually make of metal, some are painted to prevent corrosion.
In sections where the fans and the coil are located, 1-2 inches of polyurethane foam or PU is used to insulate them to prevent the condensation on the panel.Drain pan is also used as a precaution in the event of condensation of water.
--Penta-post extra heavy gauge aluminum profiles and strong fiber-reinforced PE corner connection forming the structural frame
--superior mechanical strength and rigidity to the unit frame and to prevent any buckling or deformation
--Thermal bridge free design, the profiles filled with polyurethane foam for insulation
--Anodizing surface treatment for profiles, corrosion-resistant
--Stainless steel frame available

Fan
Centrifugal fan is used to circulate the air to the various parts of the sections in the building.The typical types of fan available are Backward Inclined, Backward Curved, Forward Curved and Airfoil.
The selection of the fan will depend on the air volume and the static pressure required of the system.Usually, the designer of the system will use a specialized software to do this selection.
In order to reduce the effect of vibration on the panel, the motor and the fan are usually installed on the vibration isolator except when the drive assembly is external to the fan casing.
In recent years, the use of variable air volume (VAV) system is becoming more popular as the volume of the air being discharged can be varied depending on the load condition.If the load is high, the fan speed will be higher and if the load is lower, the speed of the fan will be lower.
The speed of the fan is varied by using frequency inverter instead of conventional motor such as PSC motor.Frequency inverter provides better control of the fan speed as a whole range of fan speed from super low to super high can now be utilized based on the load conditions required.
This technology has enabled better use of energy and is in tandem with the move to go for greener energy.

Vibration Eliminator
• To reduce the transmission of vibration and noise, fan and motor are installed on an independent complete base frame
• The complete base frame is isolated by deflection type spring isolators
• This unique structure not only reduce the vibration and noise, but also protect fan and motor during transportation
Cooling Coil
Cooling Coil is used to cool and dehumidify the air.Both DX (direct expansion) cooling and CW (chilled water) cooling coils are available for use depending on the system design.
These coils are arranged in rows with different fin spacing.Aluminum fins and copper tubes are used in the design of the coils.The corrosion resistance hydrophilic fins are also used due to its lower cost and lower resistance to the air velocity.

Filters
Filters are to remove particles and contaminants of various sizes from the air.The type of air filter being used will very much depend on the application of the system.
Panel Filter is a flat and rectangular in shape and provides a minimum low efficiency filtration which is acceptable to the air conditioning industry.The high velocity filter is arranged vertically whereas the low velocity filter is arranged in V shape.Typical air velocity that moves through the filters is in the range of 2-3 m/s.

Stainless Steel Drain Pan
• Slop type design, no drain water carryover and keep the pan dry
• Avoid the micro-organisms growth inside the drain pan
Antimicrobial Drain Pan is offered as option
• SteriTouch technology Drip Pan Coating
• Antimicrobial surface
• Good exterior durability and corrosion resistance
• Excellent adhesion
• Non-toxic, comply with BS476 part 7

Electrical control cabinet(optioanl)
•According to the requirements and functions of the unit to design the control console or cabinet
•Auto control each section of the unit to make sure the temperature, humidity and cleaness
•High quality and international brand electrical elements
•DDC and PLC available
6.Why choose us?
Eurostars offers Services:
•Consultancy
•System Design
•Technical support
•Customized manufacturing
•General testing before delivery
•Spare parts supply according to order quantity
•Long warranty period
•OEM service available

7.FAQ
Q:What are the differences between an air conditioner and an air handler?
Air handlers are an important part of your overall HVAC system, but they are not the complete air conditioning system.
An air handler is responsible for housing the equipment necessary to move air through your home or business.In most cases, it is located inside and operates both the heating and cooling systems.Air handlers look like a furnace, and are sometimes even mistaken for one.Air handlers can be made to work with a heat pump or air conditioner.It includes the indoor coil, which depending on the setting your system is running on, is used for both heating and cooling.
Air conditioning units include the condenser and are usually kept outside of your home or business.Air conditioners actively pull heat out of the building through a variety of components configured together, and then this hot air is redirected outside.Throughout the process, air moves through the system via return ducts and over a refrigerant coil.Instead of adding cold air to the room, which is what it feels like, the system is actually just pulling hot air out and then recirculating the same air (without the heat) back into the building.
8.Customer visit us

9.Air handling unit,air handler delivery or container loading

10.Installation instruction or installation photo, project photos
---1. During installation, enough space should be reserved around the unit, especially aside the access door and water pipe, for the repair machine passing.
---2. The unit should be mounted on flat base (concrete or welded C-channel). Drainages are available around the base.
---3. Floor drain should be set in the machine room for the discharge of condensing water and washing water.
---4.Pay attention to condensing water discharging; to ensure the condensing water discharge smoothly.
---5. The unit should be installed on a horizontal platform or hanger. After the unit is installed, connect the kinds of pipes and ducts:
A. The chilled water pipe connection with cooling coil;
B. The condensing water drain pipe connection;
C. Humidifier pipes connection;
D. The connection for the fresh/return air inlet with its air ducts;
E. The wiring connection for the control box.
When connecting the air duct, 100-150mm flexible connection (airtight canvas or artificial leather cloth) should be set between flange and air inlet/outlet, to avoid the air leakage caused by the unit vibration.
The control box normally is installed on the unit cabinet or in the machine room. Please make the wiring according to the related electrical regulation by your country.
---6.After all water pipe, wirings and air duct are correctly connected, the air handling unit can be started.
[ !]The first time starting should be instructed by an experienced person at site, non-experienced person can't operate the equipment without permit. The defect caused by misuse shall not be our obligation;
[ !] Before first time starting, please remove the temporary fixing plate from the fan and motor;
[ !] The power and voltage supply must be compatible with the unit. After connecting the power to the motor, start motor first, then check the running direction of the fan. If it is running in opposite direction, please stop and change the phase sequence, then connect the power to motor finally. If there is protection device on the supply fan motor, the motor raring should be connected to ground. The motor in this unit use "reduced voltage starting".
---7. Adjustment of the driving belt
---8. Before moving the unit, please fasten the damping device. Putting down should be slowly to make sure that the damping device is forced evenly to protect the damping device. The connection between damping device and the unit should not be by welding
About the Supplier
This supplier has been audited by BV. Verify the report on the official BV website with ID "MIC-ASR232130". Items marked "" are certified.
Company Profile
We, EUROSTARS, is a modern hi-tech enterprise, specializing in Heating Ventilation Air Conditioning and Industrial Refrigeration research, development, production, sales and engineering services.
The current product lines range from central Heating Ventilation Air Conditioning System to Industrial Refrigeration and Cooling System; Main products including as below:
- Commercial Water Cooled Chiller (with heat recovery)
- Commercial Air Cooled Chiller (with heat recovery)
- Industrial Chillers including Glycol Chillers (with heat recovery)
- Water(Ground)Source Heat Pump
- Air Source Heat Pump
- Unitary Air Conditioner, including ducted split air conditioner, rooftop air conditioner
- Fan Coil Unit and Air Handlers
-Cold Room Condensing Unit and Cold Room Evaporators
- Heat Exchangers, including tube shell heat exchanger, finned tube heat exchanger
We strive to become the best Reliable Manufacturer and Supplier of High Quality Heating Ventilation Air Conditioning and Industrial Refrigeration, offer wide range of products and competitive price for meeting the customers' real demand.
Perfect quality depends on the professional technical support team and standardized operation flow. EUROSTARS owns advanced production and testing equipments, including assembly production lines for large and small units respectively, heat exchanger pipeline, CNC processing center, CNC punching and bending machine, pipe expanding machine, automatic welder, large national-level testing center for water cooled and air cooled chiller, national-level testing center for water (heat pump) unit, etc., thus ensuring product quality and services.
EUROSTARS Spirit: Openness Sincerity the Base, Professional Supreme
EUROSTARS Tenet: Environmental Friendly, Energy Saving
EUROSTARS Service Philosophy: Customer-focused to Win-Win Platform
EUROSTARS Quality Policy: Product Quality for Fundamental
About Our Factory & Business Background
-
Business Type
- Manufacturer/Factory & Trading Company
- Address
- The Third Industrial Area, No. 150, Sha Song Road, Bao an District, Shenzhen, Guangdong, China
-
Plant Area
- 4200 square meters
-
Number of Employees
- 45
-
Registered Capital
- 500,000 RMB
-
Terms of Payment
- LC, T/T
-
International Commercial Terms(Incoterms)
- FOB, CIF, CFR
-
Average Lead Time
-
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays -
Nearest Port
- Shenzhen Port
Our Production Capability & Technical Expertise
-
Main Products
- Water Chiller, Fan Coil, Package Air Conditioning, Refrigeration Condensing Unit-Evaporator
-
Production Machines
- Bending Facility, Fin Punching Facility, Laser Cutting Facility, Punching Facility, Tube Bending Facility
-
ODM Service Available
- Yes
-
OEM Service Available
- Yes
-
R&D Engineers
- 4 people
-
Own Brand
- Yes
Our Industry Experience & Global Business Record
-
Year of Establishment
- 2013-06-03
- Export Year
- 2013-06-11
-
Main Markets
- South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia
-
Number of Foreign Trading Staff
- 3
-
Overseas Agent/Branch
- No
Our Certifications, Standards & Industry Recognition
-
Product Certification
- CE
Send your message to this supplier
People who viewed this also viewed
-
US$80.00-150.00 / Piece
-
US$150.00-290.00 / Piece
-
US$80.00-150.00 / Piece
-
US$300.00-20,000.00 / Piece
-
US$80.00-150.00 / Piece
-
US$80.00-150.00 / Piece
-
US$80.00-210.00 / Piece
-
US$60.00-180.00 / Piece
-
US$60.00-180.00 / Piece
-
US$1,000.00-12,000.00 / Piece
Find Similar Products By Category
- Supplier Homepage
- Products
- Air Handling Unit/Air Handler
- Air Conditioning Clean Room Modular Air Handling Unit
Related Categories
Hot Searches
- Air Cooler Factories
- Air Pump Factories
- Air Compressor Factories
- Air Cylinder Factories
- Air Handling Unit Prices
- Custom Air Handling Unit
- Air Handling Unit Cost
- Air Handling Unit Component
- Hvac Air Handling Unit
- Air Handling Unit Bulkbuy